{"id":14806,"date":"2023-10-20T08:35:42","date_gmt":"2023-10-20T15:35:42","guid":{"rendered":"https:\/\/www.3c-ren.org\/?post_type=on-demand-trainings&#038;p=14806"},"modified":"2025-03-05T09:29:05","modified_gmt":"2025-03-05T17:29:05","slug":"the-electrification-path-a-case-study","status":"publish","type":"on-demand-trainings","link":"https:\/\/www.3c-ren.org\/es\/trainings\/the-electrification-path-a-case-study\/","title":{"rendered":"The Electrification Path \u2013 A Case Study"},"content":{"rendered":"\n<p>As California begins to electrify, homeowners will each have a unique path to electrification. For some, this means upgrading one appliance at a time; for others, it means replacing them all at once and offsetting with on-site solar. Regardless of the timeline, there are some important planning steps that must take place, as well as a continual vision for optimizing efficiency.<\/p>\n\n\n\n<p>During this webinar, EMH will present a case study of a customer\u2019s electrification journey. You\u2019ll hear directly from the customer, who will share why they went gas-free, what their experience was like, and what bumps in the road were faced on this adventure.<\/p>\n\n\n\n<p><strong>Learning Objectives:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>What is the first step in the Electrification \u201cOrder of Operations?\u201d<\/li>\n\n\n\n<li>Name three capabilities a customer should look for in their Electrification Partner<\/li>\n\n\n\n<li>Explain EMH\u2019s reasoning behind their water heating approach for this customer<\/li>\n\n\n\n<li>Why was it important to have the attic ductwork buried?<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>As California begins to electrify, homeowners will each have a unique path to electrification. For some, this means upgrading one appliance at a time; for others, it means replacing them [&hellip;]<\/p>\n","protected":false},"featured_media":15130,"template":"","format":"standard","meta":{"_acf_changed":true},"audience":[252,253,345,346,257],"instructor":[230],"language":[201],"primary-topic":[302],"sub-topic":[261,271,278,279,295],"video-length":[204],"video-series-and-grouping":[],"video-type":[198],"class_list":["post-14806","on-demand-trainings","type-on-demand-trainings","status-publish","format-standard","has-post-thumbnail","hentry","audience-architects-designers","audience-contractors-tradespeople","audience-energy-consultants","audience-engineers","audience-residents","instructor-electrify-my-home-larry-waters","language-english","primary-topic-electrification","sub-topic-air-sealing","sub-topic-envelope-enclosure","sub-topic-heating-ventilation-and-air-conditioning-hvac","sub-topic-insulation","sub-topic-water-heating-distribution","video-length-medium-15-min-to-2-hours","video-type-training-webinar"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Electrification Path \u2013 A Case Study - 3C-REN<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"http:\/\/www.3c-ren.org\/trainings\/the-electrification-path-a-case-study\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Electrification Path \u2013 A Case Study - 3C-REN\" \/>\n<meta property=\"og:description\" content=\"As California begins to electrify, homeowners will each have a unique path to electrification. For some, this means upgrading one appliance at a time; for others, it means replacing them [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"http:\/\/www.3c-ren.org\/trainings\/the-electrification-path-a-case-study\/\" \/>\n<meta property=\"og:site_name\" content=\"3C-REN\" \/>\n<meta property=\"article:modified_time\" content=\"2025-03-05T17:29:05+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/www.3c-ren.org\/wp-content\/uploads\/2023\/10\/Screenshot-2025-03-05-at-11.28.37\u202fAM.png\" \/>\n\t<meta property=\"og:image:width\" content=\"661\" \/>\n\t<meta property=\"og:image:height\" content=\"638\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/www.3c-ren.org\\\/trainings\\\/the-electrification-path-a-case-study\\\/\",\"url\":\"http:\\\/\\\/www.3c-ren.org\\\/trainings\\\/the-electrification-path-a-case-study\\\/\",\"name\":\"The Electrification Path \u2013 A Case Study - 3C-REN\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.3c-ren.org\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"http:\\\/\\\/www.3c-ren.org\\\/trainings\\\/the-electrification-path-a-case-study\\\/#primaryimage\"},\"image\":{\"@id\":\"http:\\\/\\\/www.3c-ren.org\\\/trainings\\\/the-electrification-path-a-case-study\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.3c-ren.org\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Screenshot-2025-03-05-at-11.28.37\u202fAM.png\",\"datePublished\":\"2023-10-20T15:35:42+00:00\",\"dateModified\":\"2025-03-05T17:29:05+00:00\",\"breadcrumb\":{\"@id\":\"http:\\\/\\\/www.3c-ren.org\\\/trainings\\\/the-electrification-path-a-case-study\\\/#breadcrumb\"},\"inLanguage\":\"es-ES\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\\\/\\\/www.3c-ren.org\\\/trainings\\\/the-electrification-path-a-case-study\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es-ES\",\"@id\":\"http:\\\/\\\/www.3c-ren.org\\\/trainings\\\/the-electrification-path-a-case-study\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.3c-ren.org\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Screenshot-2025-03-05-at-11.28.37\u202fAM.png\",\"contentUrl\":\"https:\\\/\\\/www.3c-ren.org\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Screenshot-2025-03-05-at-11.28.37\u202fAM.png\",\"width\":661,\"height\":638},{\"@type\":\"BreadcrumbList\",\"@id\":\"http:\\\/\\\/www.3c-ren.org\\\/trainings\\\/the-electrification-path-a-case-study\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.3c-ren.org\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Electrification Path \u2013 A Case Study\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.3c-ren.org\\\/#website\",\"url\":\"https:\\\/\\\/www.3c-ren.org\\\/\",\"name\":\"3C-REN\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.3c-ren.org\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.3c-ren.org\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es-ES\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.3c-ren.org\\\/#organization\",\"name\":\"3C-REN\",\"url\":\"https:\\\/\\\/www.3c-ren.org\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es-ES\",\"@id\":\"https:\\\/\\\/www.3c-ren.org\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.3c-ren.org\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/3C-REN_logo_header_318x72.jpg\",\"contentUrl\":\"https:\\\/\\\/www.3c-ren.org\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/3C-REN_logo_header_318x72.jpg\",\"width\":318,\"height\":72,\"caption\":\"3C-REN\"},\"image\":{\"@id\":\"https:\\\/\\\/www.3c-ren.org\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.youtube.com\\\/@tricountyren\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/tri-county-regional-energy-network\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Electrification Path \u2013 A Case Study - 3C-REN","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"http:\/\/www.3c-ren.org\/trainings\/the-electrification-path-a-case-study\/","og_locale":"es_ES","og_type":"article","og_title":"The Electrification Path \u2013 A Case Study - 3C-REN","og_description":"As California begins to electrify, homeowners will each have a unique path to electrification. For some, this means upgrading one appliance at a time; for others, it means replacing them [&hellip;]","og_url":"http:\/\/www.3c-ren.org\/trainings\/the-electrification-path-a-case-study\/","og_site_name":"3C-REN","article_modified_time":"2025-03-05T17:29:05+00:00","og_image":[{"width":661,"height":638,"url":"http:\/\/www.3c-ren.org\/wp-content\/uploads\/2023\/10\/Screenshot-2025-03-05-at-11.28.37\u202fAM.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"http:\/\/www.3c-ren.org\/trainings\/the-electrification-path-a-case-study\/","url":"http:\/\/www.3c-ren.org\/trainings\/the-electrification-path-a-case-study\/","name":"The Electrification Path \u2013 A Case Study - 3C-REN","isPartOf":{"@id":"https:\/\/www.3c-ren.org\/#website"},"primaryImageOfPage":{"@id":"http:\/\/www.3c-ren.org\/trainings\/the-electrification-path-a-case-study\/#primaryimage"},"image":{"@id":"http:\/\/www.3c-ren.org\/trainings\/the-electrification-path-a-case-study\/#primaryimage"},"thumbnailUrl":"https:\/\/www.3c-ren.org\/wp-content\/uploads\/2023\/10\/Screenshot-2025-03-05-at-11.28.37\u202fAM.png","datePublished":"2023-10-20T15:35:42+00:00","dateModified":"2025-03-05T17:29:05+00:00","breadcrumb":{"@id":"http:\/\/www.3c-ren.org\/trainings\/the-electrification-path-a-case-study\/#breadcrumb"},"inLanguage":"es-ES","potentialAction":[{"@type":"ReadAction","target":["http:\/\/www.3c-ren.org\/trainings\/the-electrification-path-a-case-study\/"]}]},{"@type":"ImageObject","inLanguage":"es-ES","@id":"http:\/\/www.3c-ren.org\/trainings\/the-electrification-path-a-case-study\/#primaryimage","url":"https:\/\/www.3c-ren.org\/wp-content\/uploads\/2023\/10\/Screenshot-2025-03-05-at-11.28.37\u202fAM.png","contentUrl":"https:\/\/www.3c-ren.org\/wp-content\/uploads\/2023\/10\/Screenshot-2025-03-05-at-11.28.37\u202fAM.png","width":661,"height":638},{"@type":"BreadcrumbList","@id":"http:\/\/www.3c-ren.org\/trainings\/the-electrification-path-a-case-study\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.3c-ren.org\/es\/"},{"@type":"ListItem","position":2,"name":"The Electrification Path \u2013 A Case Study"}]},{"@type":"WebSite","@id":"https:\/\/www.3c-ren.org\/#website","url":"https:\/\/www.3c-ren.org\/","name":"3C-REN","description":"","publisher":{"@id":"https:\/\/www.3c-ren.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.3c-ren.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es-ES"},{"@type":"Organization","@id":"https:\/\/www.3c-ren.org\/#organization","name":"3C-REN","url":"https:\/\/www.3c-ren.org\/","logo":{"@type":"ImageObject","inLanguage":"es-ES","@id":"https:\/\/www.3c-ren.org\/#\/schema\/logo\/image\/","url":"https:\/\/www.3c-ren.org\/wp-content\/uploads\/2024\/05\/3C-REN_logo_header_318x72.jpg","contentUrl":"https:\/\/www.3c-ren.org\/wp-content\/uploads\/2024\/05\/3C-REN_logo_header_318x72.jpg","width":318,"height":72,"caption":"3C-REN"},"image":{"@id":"https:\/\/www.3c-ren.org\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.youtube.com\/@tricountyren","https:\/\/www.linkedin.com\/company\/tri-county-regional-energy-network"]}]}},"_links":{"self":[{"href":"https:\/\/www.3c-ren.org\/es\/wp-json\/wp\/v2\/on-demand-trainings\/14806","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.3c-ren.org\/es\/wp-json\/wp\/v2\/on-demand-trainings"}],"about":[{"href":"https:\/\/www.3c-ren.org\/es\/wp-json\/wp\/v2\/types\/on-demand-trainings"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.3c-ren.org\/es\/wp-json\/wp\/v2\/media\/15130"}],"wp:attachment":[{"href":"https:\/\/www.3c-ren.org\/es\/wp-json\/wp\/v2\/media?parent=14806"}],"wp:term":[{"taxonomy":"audience","embeddable":true,"href":"https:\/\/www.3c-ren.org\/es\/wp-json\/wp\/v2\/audience?post=14806"},{"taxonomy":"instructor","embeddable":true,"href":"https:\/\/www.3c-ren.org\/es\/wp-json\/wp\/v2\/instructor?post=14806"},{"taxonomy":"language","embeddable":true,"href":"https:\/\/www.3c-ren.org\/es\/wp-json\/wp\/v2\/language?post=14806"},{"taxonomy":"primary-topic","embeddable":true,"href":"https:\/\/www.3c-ren.org\/es\/wp-json\/wp\/v2\/primary-topic?post=14806"},{"taxonomy":"sub-topic","embeddable":true,"href":"https:\/\/www.3c-ren.org\/es\/wp-json\/wp\/v2\/sub-topic?post=14806"},{"taxonomy":"video-length","embeddable":true,"href":"https:\/\/www.3c-ren.org\/es\/wp-json\/wp\/v2\/video-length?post=14806"},{"taxonomy":"video-series-and-grouping","embeddable":true,"href":"https:\/\/www.3c-ren.org\/es\/wp-json\/wp\/v2\/video-series-and-grouping?post=14806"},{"taxonomy":"video-type","embeddable":true,"href":"https:\/\/www.3c-ren.org\/es\/wp-json\/wp\/v2\/video-type?post=14806"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}